Los Robles Urbanization

General

CLIENT: Los Robles Reserve

PROJECT LOCATION: Santo Domingo

Project description

Earthworks and readjustment of the land, drinking water system, rainwater drainage and wastewater treatment plant for the development of the new residential project Reserva Los Robles.

Technical details of the project

Clearing of land, cutting and filling 300,000 mts.3 with internal caliche, stabilisation of road surface with 4.5% cement, construction of pavements and embankments (road stabilisation 4.1 km).